Process of Implementation
The project began with a site assessment to identify structural elements, access points, and safety requirements. A demolition sequence was planned to ensure controlled removal of the building while minimising risk to adjacent properties.
Internal strip-out works were completed first, followed by systematic demolition of the main structure. Materials were handled and removed in stages to maintain site order and allow safe machine access where required.
Throughout the process, the site was monitored closely to ensure safe working practices and compliance with agreed demolition procedures.
Overcoming Challenges
The main challenge was carrying out demolition works within a residential area with nearby properties. This was managed through controlled demolition methods, careful debris handling, and maintaining strict site boundaries at all times.
Project Outcome
The demolition was completed safely and efficiently, leaving a clear and level site ready for redevelopment. The client was satisfied with the controlled approach, site safety, and timely completion of the works.